Well, there are no new pictures of the inside of the house because we haven't done anything new inside. Zeke completed the trench last week for all of the electrical wiring. Zeke, Jeff and Scott were able to put siding up on one side of the house. The rest of the siding had to wait for the front porch, which had to wait for the basement to be poured, which had to wait for the radiant floor heating to be installed, which was done on Saturday. We have also been waiting for our last delivery of insulation, roofing and kitchen cabinets, which came today. It has been a dry summer, which has made timing on our sand mound work out well. It was started this week, as shown in the picture above. The picture of Sam, Paul and Abby shows them waiting at the stair well on the first floor for the concrete to be poured into the basement. Zeke also built a rock wall next to the basement door. We enjoyed a few days of nicer weather last week and now it is hot! Swimming has been a favorite activity of the kids. Both Abby and Paul have learned to swim underwater in the last 2 weeks. It was so hot today that spray cans of paint were exploding in Jeff's truck. It doesn't look like it is going to cool off any time soon. In the next week or two we are expecting... the siding complete, to finish the front porch, have the transformer installed and wires run to the street, windows and doors and maybe even a roof!
Tuesday, July 6, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment